Control design stops waiting for assembly
The I/O list and the BOM are settled while the machine is still a drawing, so control design runs alongside mechanical assembly instead of after it. The wait drops out of the schedule, and the people wiring the machine and the people programming it work from the same table.
What you get
I/O list, BOM, communication map and power distribution table — ready for your electrical CAD